AE Oscroft & Sons.

A purpose-built 20 t wood pellet silo we designed, made and installed for a Worcestershire automotive-pressings maker — replacing two unfit shipping containers, with a base engineered around the existing feed screws and commissioned in two days.

All case studies
LocationRedditch, Worcestershire, UK
FuelWood pellet
FormatRectangular
ScopeDesign · Build · Install
Rectangular wood pellet silo installed at Redditch, Worcestershire, UK
Project

Project details.

Figures and scope are specific to this installation.

01LocationRedditch, Worcestershire, UK
02FuelWood pellet
03FormatRectangular
04System20 t pellet silo feeding two 200 kW boilers (400 kW)
05ScopeDesign · Build · Install
Notes

What the project shows.

01

20 t purpose-built pellet silo

02

Base integrates the existing fixed feed screws

03

Feeds two 200 kW boilers; live in two days