Project exampleAE Oscroft & Sons.
A purpose-built 20 t wood pellet silo we designed, made and installed for a Worcestershire automotive-pressings maker — replacing two unfit shipping containers, with a base engineered around the existing feed screws and commissioned in two days.
LocationRedditch, Worcestershire, UK
FuelWood pellet
FormatRectangular
ScopeDesign · Build · Install

Project
Project details.
Figures and scope are specific to this installation.
01LocationRedditch, Worcestershire, UK
02FuelWood pellet
03FormatRectangular
04System20 t pellet silo feeding two 200 kW boilers (400 kW)
05ScopeDesign · Build · Install
Notes
What the project shows.
01
20 t purpose-built pellet silo
02
Base integrates the existing fixed feed screws
03
Feeds two 200 kW boilers; live in two days
More projects
Other installations.
F&H Panton
Fifteen wood pellet silos — over 160 t of storage — we designed, made and installed…
Bord na Móna HQ
A 32 t wood pellet silo we designed, made and installed at the headquarters of Bord…
Game of Thrones Studio Tour
A 24 t wood pellet silo we designed, made and installed in the basement of the Game…