Entrade HQ.

Five 14 t silos and four 50 kW CHP boilers we designed, made and installed at Entrade’s Knowsley HQ in Liverpool — beside two stacked 40 ft container units, growing to 25 silos on site, with further systems in Germany, Japan and Puerto Rico.

All case studies
LocationKnowsley, Liverpool, UK
FuelBiomass · waste
FormatSquare
ScopeDesign · Build · Install
Square biomass · waste silo installed at Knowsley, Liverpool, UK
Project

Project details.

Figures and scope are specific to this installation.

01LocationKnowsley, Liverpool, UK
02FuelBiomass · waste
03FormatSquare
04SystemFive 14 t silos & 4 × 50 kW CHP boilers — 25 silos in all
05ScopeDesign · Build · Install
Notes

What the project shows.

01

Five 14 t silos feeding 4 × 50 kW CHP boilers

02

Grew to 25 silos as an on-site testing centre

03

Further systems in Germany, Japan & Puerto Rico