Project exampleEntrade HQ.
Five 14 t silos and four 50 kW CHP boilers we designed, made and installed at Entrade’s Knowsley HQ in Liverpool — beside two stacked 40 ft container units, growing to 25 silos on site, with further systems in Germany, Japan and Puerto Rico.
LocationKnowsley, Liverpool, UK
FuelBiomass · waste
FormatSquare
ScopeDesign · Build · Install

Project
Project details.
Figures and scope are specific to this installation.
01LocationKnowsley, Liverpool, UK
02FuelBiomass · waste
03FormatSquare
04SystemFive 14 t silos & 4 × 50 kW CHP boilers — 25 silos in all
05ScopeDesign · Build · Install
Notes
What the project shows.
01
Five 14 t silos feeding 4 × 50 kW CHP boilers
02
Grew to 25 silos as an on-site testing centre
03
Further systems in Germany, Japan & Puerto Rico