Home · Case Studies · Meden School
Project exampleMeden School.
An 80 m³ wood chip silo and loading auger we designed, made and installed for a Nottinghamshire secondary school — feeding two wood chip boilers that replaced its old coal boilers, powder-coated to match the school and boiler cabin.
LocationNottinghamshire, UK
FuelWood chip
FormatRectangular
ScopeDesign · Build · Install

Project
Project details.
Figures and scope are specific to this installation.
01LocationNottinghamshire, UK
02FuelWood chip
03FormatRectangular
04System80 m³ wood chip silo & loading auger feeding two boilers
05ScopeDesign · Build · Install
Notes
What the project shows.
01
80 m³ wood chip silo with loading auger
02
Feeds two boilers that replaced coal
03
Saves close to 1,000 t of carbon a year
More projects
Other installations.
Tell us about your project.
Tell us the fuel, the footprint and the feed. An engineer replies within one working day.