Villa Nurseries.

Two 90 m³ waste wood silos — 180 m³ in all — we designed, made and installed for a large Essex tomato grower running 2 × 2.5 MW biomass boilers; each has a 45° conical base, agitator extractor and ATEX explosion panels.

All case studies
LocationEssex, UK
FuelWaste wood
FormatCylindrical
ScopeDesign · Build · Install
Cylindrical waste wood silo installed at Essex, UK
Project

Project details.

Figures and scope are specific to this installation.

01LocationEssex, UK
02FuelWaste wood
03FormatCylindrical
04SystemTwo 90 m³ waste wood silos (180 m³) feeding 2 × 2.5 MW boilers
05ScopeDesign · Build · Install
Notes

What the project shows.

01

Two 90 m³ waste wood silos (180 m³ total)

02

Feeds 2 × 2.5 MW boilers, ~4,000 t CO₂ saved a year

03

45° conical base, agitator extractor, ATEX panels

Tell us about your project.