Home · Case Studies · Beckman Coulter
Project example

Beckman Coulter.

A 90 m³ galvanised-steel silo we designed, made and installed for medical-device maker Beckman Coulter — feeding a 550 kW multi-fuel boiler that heats a new 6,700 m² building on chip and pellet, with auger loading at up to 45 m³/hr.

All case studies
LocationCo. Clare, Ireland
FuelWood chip · pellet
FormatCylindrical
ScopeDesign · Build · Install
Cylindrical wood chip · pellet silo installed at Co. Clare, Ireland
Project

Project details.

Figures and scope are specific to this installation.

01LocationCo. Clare, Ireland
02FuelWood chip · pellet
03FormatCylindrical
04System90 m³ galvanised silo feeding a 550 kW multi-fuel boiler
05ScopeDesign · Build · Install
Notes

What the project shows.

01

90 m³ galvanised silo, auger loaded to 45 m³/hr

02

Feeds a 550 kW multi-fuel (chip + pellet) boiler

03

Heats a 6,700 m² building, 50%+ off heating

Tell us about your project.