Project exampleBeckman Coulter.
A 90 m³ galvanised-steel silo we designed, made and installed for medical-device maker Beckman Coulter — feeding a 550 kW multi-fuel boiler that heats a new 6,700 m² building on chip and pellet, with auger loading at up to 45 m³/hr.
LocationCo. Clare, Ireland
FuelWood chip · pellet
FormatCylindrical
ScopeDesign · Build · Install

Project
Project details.
Figures and scope are specific to this installation.
01LocationCo. Clare, Ireland
02FuelWood chip · pellet
03FormatCylindrical
04System90 m³ galvanised silo feeding a 550 kW multi-fuel boiler
05ScopeDesign · Build · Install
Notes
What the project shows.
01
90 m³ galvanised silo, auger loaded to 45 m³/hr
02
Feeds a 550 kW multi-fuel (chip + pellet) boiler
03
Heats a 6,700 m² building, 50%+ off heating