Project example

Devonshire Pine.

A 60 m³ cylindrical silo and boiler-feed system we designed, made and installed for a Devon furniture maker — storing shavings, chip and sawdust from its own CNC machinery and feeding the boiler auger at a precise 308 kg/hr.

All case studies
LocationBideford, Devon, UK
FuelWood chip · shavings
FormatCylindrical
ScopeDesign · Build · Install
Cylindrical wood chip · shavings silo installed at Bideford, Devon, UK
Project

Project details.

Figures and scope are specific to this installation.

01LocationBideford, Devon, UK
02FuelWood chip · shavings
03FormatCylindrical
04System60 m³ cylindrical wood-waste silo (3.5 × 6 m), 308 kg/hr feed
05ScopeDesign · Build · Install
Notes

What the project shows.

01

60 m³ silo (3.5 m dia × 6 m), built in situ

02

Runs on the factory’s own CNC wood waste

03

Feeds the boiler auger at a precise 308 kg/hr